Project Overview
Project Overview
A two-phase waste-to-energy project in Selangor with generating capacities of 32 MW and 35 MW respectively.
Hubei Haiwen participated in preliminary and detailed construction design in accordance with applicable IEC and IEEE standards.
Hubei Haiwen provided technical services appropriate to the project type. The information shown here is limited to disclosed project materials and does not extend beyond publicly available contract scope or delivery outcomes.
Related Services
Conventional Power EngineeringPreliminary DesignDetailed DesignOverseas Project






